Close Menu

    Subscribe to Updates

    Get the latest creative news from us about Real Estate

    What's Hot

    Buying with Your Partner or Spouse

    March 6, 2026

    2 Br 2 Ba Condo For Rent In Willowdale East Located At 2 Anndale Drive, Toronto Ontario M2N 0G5

    March 2, 2026

    7 Things to Look for When Hiring a Listing Agent in 2026

    February 27, 2026
    Facebook X (Twitter) Instagram
    Homegoal
    • Home
    • Real Estate
    • Homebuying
    • Selling
    • Investing
    • Lifestyle
    • About Us
    Facebook X (Twitter) Instagram YouTube
    Homegoal
    Home»Real Estate»Carttera Buys 1266 Queen Street West Project For $28M
    Real Estate

    Carttera Buys 1266 Queen Street West Project For $28M

    homegoal.caBy homegoal.caJune 13, 2025No Comments4 Mins Read
    WhatsApp Facebook Twitter Pinterest LinkedIn Email
    Share
    WhatsApp Facebook Twitter LinkedIn Email Copy Link



    [Editor’s Note: A previous version of this article incorrectly identified Republic Developments as the owner of 1266 Queen Street West. They were the developer of the property, but not the owners.]

    A large high-rise project set for the Queen West neighbourhood of Toronto has changed hands, with real estate developer and investment manager Carttera acquiring the project after it was initiated by Republic Developments.


    The site of the project is 1266 Queen Street West, directly adjacent to the Parkdale Amphitheatre at the intersection of Queen Street West and Dufferin Street, as well as the Canadian Pacific Railway tracks. The property is currently occupied by an old low-rise commercial building.

    Earlier this week, Carttera announced that they had acquired the site in a transaction brokered by Jeremiah Shamess of Colliers. The property is now held under 1266 Queen Street West GP Inc.

    The property was previously owned by DKI Queen Inc., who retained Republic Developments as a consultant on the project.

    “In what continues to be a challenging and highly selective market for development sites, getting this deal across the finish line is something our entire team is proud of,” said Republic Developments in their own announcement this week. “It speaks to the value of the asset, the resilience of good real estate, and the strength of relationships that make these transactions happen.”

    Transaction details were not disclosed by either party, but Carttera acquired 1266 Queen Street West from DKI Queen Inc. for $27,900,000 on June 6, according to transaction info from commercial real estate intelligence firm Altus Group.

    According to City of Toronto records, the project has been in the works since at least April 2023, when Republic submitted the original application. The original proposal was for 25 storeys and 381 residential units, before being reduced to 23 storeys and 329 units in October 2023.

    Another set of revised plans was submitted to the City earlier this year by Carttera, which was the first indication that the project was changing hands. Carttera’s proposal is now for a 27-storey tower with 362 units, with all of the residential units now proposed as rentals instead of condos. A planning rationale prepared by Batory Planning + Management cites the federal government’s elimination of GST on new rental construction and the City of Toronto’s reduced property tax incentive as some of the reasons for the pivot to rental.

    Notably, although the number of floors has been increased, the height of the tower remains exactly the same as the previous proposal, which was approved in July 2024.

    The 362 rental units are split between 197 one-bedroom units, 128 two-bedroom units, 36 three-bedroom units, and one four-bedroom unit. Carttera’s proposal eliminated all of the studio units and reduced the number of one-bedroom units, while increasing the amount of family-sized units.

    Other changes include the building podium being reduced from five to three storeys, the tower floorplate being increased, the amount of indoor and outdoor amenity space both being increased, and the number of vehicle and bicycle parking spaces both being reduced.

    BDP Quadrangle remains the architect of the project, and the firm will be targeting LEED Silver certification as a minimum and Zero Carbon certification from the Canadian Green Building Council.

    “The revised development continues to make efficient use of underutilized commercial land located within a Settlement Area and within 500 metres of the future Liberty Village GO Station – areas explicitly designated for intensification by the Provincial Planning Statement (2024),” the planning rationale states. “The revised proposal conforms with the objectives of the Built Form and Public Realm policies of the Official Plan, being designed to fit within its surrounding context, transition appropriately to and limit overlook, sky view, wind, and shadow impacts on adjacent properties. The proposal is also consistent with the general intent and direction of the relevant Design Guidelines.”

    In a cover letter submitted along with its revised proposal, Carttera said that it is hoping to complete the Site Plan Control application by Q4 2025 so it can commence construction on the project in Spring 2026.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Ontario government to take control of RECO

    November 28, 2025

    A Regional Color Guide for Your Home 

    November 28, 2025

    MLS governance is falling behind the markets it serves

    November 28, 2025
    Leave A Reply Cancel Reply

    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    Don't Miss
    Homebuying

    Buying with Your Partner or Spouse

    By homegoal.caMarch 6, 2026

    Buying a home together is one of the biggest financial commitments you’ll ever make as…

    2 Br 2 Ba Condo For Rent In Willowdale East Located At 2 Anndale Drive, Toronto Ontario M2N 0G5

    March 2, 2026

    7 Things to Look for When Hiring a Listing Agent in 2026

    February 27, 2026

    If You Listed Your Toronto Home in 2025, There Was a 1 in 2 Chance Your Agent Sold Fewer Than 5 Properties Last Year

    February 24, 2026

    5 Br 3 Ba House For Rent Located At 24 Conklin Drive, Brampton Ontario L7A 3P5

    February 21, 2026

    What Downsizers Get Wrong About Timing the Market

    February 20, 2026

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    • Contact Us
    • About Us
    • Privacy Policy
    • Term and Conditions
    © 2026 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.